ClimaChain
ClimaChainImmunization Continuity · Yobe
OverviewAction queueWeekly briefBackbone →
ClimaChain·Yobe immunization-continuity pilot
Prototype · seeded pilot inputs

For state & LGA teams

Weekly operational brief

9 facilities flagged this week. Export as a PDF brief for the meeting, or an SMS-ready block for low bandwidth field use.

CSV

By LGA

This week's framing

LGA brief

Damaturu

High56

Damaturu this week: supervision and cold chain verification priority.

Why it is flagged

  • 8 hot days forecast
  • 7 hot days forecast
  • 6 hot days forecast

Do this week

  1. 1Prioritize supportive supervision and verify cold chain temperature logs at flagged facilities

Confidence: estimated – based on seeded / forecast inputs.

LGA brief

Potiskum

Severe63

Potiskum this week: outreach rescheduling and pre-positioning priority.

Why it is flagged

  • 6 hot days forecast
  • no power source
  • 4 hot days forecast

Do this week

  1. 1Reschedule outreach around the hazard window
  2. 2Pre-position vaccines and ice packs at flagged posts

Confidence: estimated – based on seeded / forecast inputs.

Detail

Flagged facilities

Export as CSV, PDF or SMS text above

FacilityLGARiskTop driverConfidence
Mamudo Health PostPotiskumSevere76no power sourceestimated
Yerimaram Outreach PostPotiskumSevere76no power sourceestimated
Maisandari Outreach PostDamaturuHigh717 hot days forecastestimated
Potiskum Central PHCPotiskumHigh666 hot days forecastestimated
Dogo Nini PHCPotiskumHigh666 hot days forecastestimated
Gabai Health PostDamaturuHigh638 hot days forecastestimated
Damaturu Central PHCDamaturuHigh627 hot days forecastestimated
Pawari PHCDamaturuHigh618 hot days forecastestimated
Bukarti ClinicPotiskumHigh536 hot days forecastestimated