ClimaChain
ClimaChainImmunization Continuity · Yobe
OverviewAction queueWeekly briefBackbone →
ClimaChain·Yobe immunization-continuity pilot
Prototype · seeded pilot inputs

Damaturu LGA·outreach post

Maisandari Outreach Post

High71Needs review

Confidence · estimated

Why flagged

Flagged High – driven mainly by 7 hot days forecast and no power source.

Score

How this score is built

Transparent, rule based: 40% hazard · 35% vulnerability · 25% stakes

Components

Hazard exposure (H)58
Facility vulnerability (V)79
Immunization stakes (L)82

Top contributing factors

  1. H7 hot days forecast+18
  2. Vno power source+14
  3. LDTP dropout 53.4%+11.3

This week

Operational brief

Facility brief

Maisandari Outreach Post

High71

High risk. This needs attention this week.

Why it is flagged

  • 7 hot days forecast
  • no power source

Response

Manage the action

Action statusNeeds review

Recommended steps

  1. 1Prioritize supportive supervision
  2. 2Check power and cold chain
  3. 3Consider outreach reschedule
Not yet reviewed

Registry

Facility context

Power
none
Cold chain
gas_fridge (unknown)
Access
checkpoint
Outreach reliance
outreach heavy
Under-1 catchment
760
DTP3 dropout
53.4%
Hot days (forecast)
7 / 10
Flood probability
8%
Rainfall anomaly
-25%
DTP dropout 53.4%

Do this week

  1. 1Prioritize supportive supervision
  2. 2Check power and cold chain
  3. 3Consider outreach reschedule

Confidence: estimated – based on seeded / forecast inputs.